New York – The Port has announced a major expansion of the rail network serving the Port of New York and New Jersey that will allow the agency to advance its five-year strategic goal to increase rail capacity for cargo destined for outside the region. This expansion will reduce congestion and emissions and get goods to their destination more efficiently and at a lower cost.

The new Port Jersey rail facility, part of what is known as the ExpressRail system, culminates a $600 million Port Authority capital investment program dating to the 1990s that established direct rail access to on-dock and near-dock intermodal rail services at its major marine terminals. The facilities were designed to reduce the port’s historical heavy reliance on trucks to transport cargo that arrives at the port via ship to its final destination. Trucks still account for moving 85 percent of the containers on and off port terminals. The opening of the final rail facility will allow the port to advance its strategic five-year goal to handle more than 900,000 rail lifts a year, the equivalent of 1.5 million fewer truck trips travelling on local roads, which will reduce congestion and greatly enhance air quality.

“Given the highly competitive nature of the port business, we need to assure shippers that we have best-in-class infrastructure and service in place to meet growing demand and to allow cargo to be moved in a smooth, efficient, timely and environmentally friendly manner to wherever its destination may be,” said Port Authority Chairman Kevin O’Toole.  “With more than 75 percent of the vessels arriving in the Port of New York and New Jersey as their first call, an efficient rail cargo system can deliver cargo to an inland destination before the vessel reaches the next U.S. port, making our port a far more attractive destination for shippers. This project, and others we are doing throughout the Port of New York and New Jersey, will ensure that we maintain our competitive edge and continue our longstanding designation as the leading port of choice on the East Coast.”

The initial phase of the ExpressRail Port Jersey intermodal facility consists of four tracks designed for active loading and unloading of cargo from the GCT Bayonne terminal that connect to a lead track to and from the main freight rail network. It also consists of two high-efficiency, all-electric, regenerative powered, widespan, dual cantilevered, rail mounted gantry cranes featuring LED lighting to load and unload containers in the intermodal yard.  By the middle of this year, the facility will be fully built out to 9,600 linear feet of an eight-track working pad, two lead tracks, as well as additional support and train storage track.

The intermodal facility will help support the port’s cargo growth and have an annual capacity of 250,000 container lifts. It will connect the GCT Bayonne terminal to CSX and Norfolk Southern’ s extensive rail network, allowing shippers to efficiently and seamlessly transfer their cargo from ship to rail; and reach key inland markets in the Midwest, New England and elsewhere in a timely manner.

“Coupled with the highest crane productivity in the harbor and now completing the ExpressRail facility in 2019, the intermodal yard provides our customers with a first port-of-call advantage for their rail cargo. GCT Bayonne is extremely well-positioned to provide our customers superior service for both local and intermodal cargos,” said John Atkins, President of GCT USA.

Every container moved at GCT Bayonne ExpressRail Port Jersey eliminates 1.5 truck trips.  Over the life of this intermodal facility, emission reductions resulting from the switch from truck to rail transport is expected to total 415 tons of nitrogen oxide and 108 tons of particulate matter, or the equivalent of taking more than 45,300 cars off the road. It also will reduce carbon dioxide emissions by 18,300 tons annually.

Founded in 1921, the Port Authority of New York and New Jersey builds, operates, and maintains many of the most important transportation and trade infrastructure assets in the country. The agency’s network of aviation, ground, rail, and seaport facilities is among the busiest in the country, supports more than 550,000 regional jobs, and generates more than $23 billion in annual wages and $80 billion in annual economic activity. The Port Authority also owns and manages the 16-acre World Trade Center site, where the 1,776-foot-tall One World Trade Center is now the tallest skyscraper in the Western Hemisphere. The Port Authority receives no tax revenue from either the State of New York or New Jersey or from the City of New York. The agency raises the necessary funds for the improvement, construction or acquisition of its facilities primarily on its own credit. For more information, please visithttp://www.panynj.gov.

 Headquartered in Vancouver, BC, GCT Global Container Terminals Inc. operates four Green Marine certified terminals in two principal North American ports. Through GCT USA on the East Coast, the company operates two award-winning facilities: GCT New York on Staten Island, NY and GCT Bayonne in Bayonne, NJ. On the West Coast, GCT Canada operates two gateway terminals: GCT Vanterm and GCT Deltaport in Vancouver and Delta, BC. Visit www.globalterminals.com or follow us @BigShipReady to find out more about GCT.